{"id":5109,"date":"2026-03-06T17:21:07","date_gmt":"2026-03-06T16:21:07","guid":{"rendered":"https:\/\/monta.com\/en-us\/?post_type=case-studies&#038;p=5109"},"modified":"2026-03-09T15:06:54","modified_gmt":"2026-03-09T14:06:54","slug":"how-electron-charger-won-800k-in-utility-incentives-with-monta","status":"publish","type":"case-studies","link":"https:\/\/monta.com\/en-us\/case-studies\/how-electron-charger-won-800k-in-utility-incentives-with-monta\/","title":{"rendered":"How Electron Charger Won $800K in Utility Incentives with Monta"},"content":{"rendered":"\n<p>Electron Charger started as a hardware manufacturer and installer, then expanded into operating their own EV charging network. Today, they manage 1,200+ charging ports across the US. They run three commercial models across their sites: direct ownership, a 50\/50 revenue share with site hosts, and charging as a service.<\/p>\n\n\n\n<p>To scale those models without scaling admin work, Electron migrated their charging network to Monta. That move standardized how they operate, improved margins, and later helped them outpace competitors when utility funding became a race, securing $800,000 in incentive revenue in just four months.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The Challenge: Manual Work and High Costs<\/h2>\n\n\n\n<p>Electron was growing fast, but their legacy backend was not keeping up. Month end turned into a week long scramble led by their Managing Director, manually reconciling charge revenue across multiple commercial models and calculating payouts by hand.<\/p>\n\n\n\n<p>As the network expanded, daily operations became harder too. Without access to live OCPP logs, the team could not quickly diagnose failed charging sessions. In some cases, they had to wait for their old software provider to respond with basic data, slowing support and creating a frustrating experience for both Electron and their site hosts.<\/p>\n\n\n\n<p>The core issue was straightforward: the system relied on manual workarounds that would not scale. High per port pricing and heavy admin started eating into margins and made it harder to stay competitive as deployments increased<\/p>\n\n\n\n<h2 class=\"wp-block-heading\">The Solution Standardizing How Electron Operates<\/h2>\n\n\n\n<p>Electron migrated to Monta in early 2025 to remove the operational bottlenecks that were slowing growth. By automating revenue workflows and improving visibility into their network, the team freed up time previously spent on manual admin and reactive support.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>Monta Wallet:<\/strong> Automatic revenue splits across Electron\u2019s three commercial models, reducing end of month reconciliation and manual payouts<\/li>\n\n\n\n<li><strong>Monta Control:<\/strong> Real time visibility into OCPP logs so the team can diagnose issues faster and reduce time spent on troubleshooting<\/li>\n\n\n\n<li><strong>Monta Hub:<\/strong> Pre commissioning chargers in the warehouse before shipping, so hardware arrives on site ready for plug and play deployment<\/li>\n<\/ul>\n\n\n<div class=\"max-w-5xl mx-auto \">\n    <quote-slider data-quotes='[{\"title\":\"\\u0022I appreciate the status dashboard [Network Overview Dashboard]. Seeing chargers that are on and off, that\\u0027s extremely helpful.\",\"quote_text\":\" I also like the new drill down integration dashboard [Monta Control] to be able to see critical information on chargers while they\\u0027re having charging sessions.\\u201d\",\"author\":\"Patrick Foley\",\"position\":\"Sales \\u0026 Project Management\",\"author_image\":\"https:\\\/\\\/monta.com\\\/app\\\/uploads\\\/sites\\\/23\\\/2026\\\/03\\\/PatrickFoley-2.png\",\"company_logo\":false,\"button_label\":\"\",\"button_link\":\"\"}]' data-background=\"transparent\" \/>\n<\/div> \n\n\n<h2 class=\"wp-block-heading\">From Reactive Support to Proactive Incident Handling<\/h2>\n\n\n\n<p>With Monta in place, Electron moved from reactive support to proactive, automated incident handling.<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Real time email alerts with detailed incident reports give the team immediate context on what is happening at the charger level<\/li>\n\n\n\n<li>Automated actions, such as hardware reboots after repeated failed sessions, cut out manual intervention and reduce downtime for drivers and site hosts<\/li>\n<\/ul>\n\n\n<div class=\"max-w-5xl mx-auto \">\n    <quote-slider data-quotes='[{\"title\":\"\\u0022I will say just in terms of what we\\u0027re getting today on the email alerts, they\\u0027re great. They\\u0027re significantly better than [their legacy backend]. \",\"quote_text\":\"I like specifically the ones that have an incident report inside of it that obviously you can go straight to. I was looking at one yesterday where you guys took proactive action on it. I think it was like two or three failed charge sessions in like a 10 minute period and it automatically did a hardware reboot which is phenomenal without us having to do anything.  So I\\u0027ve been really happy with that on the individual level and this will be really helpful for us as well. So thank you.\\u0022\",\"author\":\"Dan Royal\",\"position\":\"Managing Director\",\"author_image\":false,\"company_logo\":false,\"button_label\":\"\",\"button_link\":\"\"}]' data-background=\"transparent\" \/>\n<\/div> \n\n\n<h2 class=\"wp-block-heading\">The Results: Better Margins and $800K in Incentives<\/h2>\n\n\n\n<p>With Monta, revenue splits and payouts now run automatically. The team can troubleshoot faster, and chargers ship pre commissioned so sites go live faster with fewer onsite issues.<\/p>\n\n\n\n<p>Electron improved unit economics by:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Moving off expensive per port software pricing that was eating into their margin<\/li>\n\n\n\n<li>Cutting the hours it takes to get each site live and fully supported<\/li>\n\n\n\n<li>Reducing the operational drag from manual reconciliation and back and forths with legacy software<\/li>\n<\/ul>\n\n\n\n<p>These improvements became a competitive advantage when AES Indiana opened a $1.5M, first come, first served incentive fund that required OpenADR 2.0b certification. Monta stepped in as a partner, working directly with both Electron and the utility to accelerate certification and keep the rollout on track.<\/p>\n\n\n\n<p>The result:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li><strong>95<\/strong> installations in four months<\/li>\n\n\n\n<li><strong>$800,000<\/strong> in incentive revenue captured for Electron before the program window closed<\/li>\n\n\n\n<li><strong>35%<\/strong> lower cost per port after migrating to Monta<\/li>\n<\/ul>\n\n\n\n<p>Electron captured AES Indiana incentives because they could execute faster. With Monta streamlining payouts, diagnostics, and deployment readiness, Electron met utility requirements quickly, deployed at speed, and secured funding while competitors were still stuck in legacy workflows and certification delays<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/monta.com\/app\/uploads\/sites\/23\/2026\/03\/EOYCard_ElectronCharger_BlogPost-1-1024x536.png\" alt=\"Statistics on a black background highlighting 2025 achievements: 467 new chargers, 10.7K successful charges, 263K kWh energy delivered, with blue geometric shapes.\" class=\"wp-image-5113\" srcset=\"https:\/\/monta.com\/app\/uploads\/sites\/23\/2026\/03\/EOYCard_ElectronCharger_BlogPost-1-1024x536.png 1024w, https:\/\/monta.com\/app\/uploads\/sites\/23\/2026\/03\/EOYCard_ElectronCharger_BlogPost-1-300x157.png 300w, https:\/\/monta.com\/app\/uploads\/sites\/23\/2026\/03\/EOYCard_ElectronCharger_BlogPost-1-768x402.png 768w, https:\/\/monta.com\/app\/uploads\/sites\/23\/2026\/03\/EOYCard_ElectronCharger_BlogPost-1-1536x804.png 1536w, https:\/\/monta.com\/app\/uploads\/sites\/23\/2026\/03\/EOYCard_ElectronCharger_BlogPost-1-2048x1072.png 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Electron Charger started as a hardware manufacturer and installer, then expanded into operating their own EV charging network. Today, they manage 1,200+ charging ports across the US. They run three commercial models across their sites: direct ownership, a 50\/50 revenue share with site hosts, and charging as a service. To scale those models without scaling &hellip; <a href=\"https:\/\/monta.com\/en-us\/case-studies\/how-electron-charger-won-800k-in-utility-incentives-with-monta\/\">Continued<\/a><\/p>\n","protected":false},"featured_media":5114,"template":"","tags":[41],"case_study_country":[97,54],"product":[57,58,71],"key_features":[85,98,99],"company_size":[73],"industry":[78],"class_list":["post-5109","case-studies","type-case-studies","status-publish","has-post-thumbnail","hentry","tag-turnkey-providers","case_study_country-canada","case_study_country-united-states","product-monta-charge","product-monta-control","product-monta-hub","key_features-monta-wallet","key_features-network-operations-dashboard","key_features-team-hierarchy","company_size-smb","industry-technology"],"acf":{"customer_name":"Electron Charger","number_of_charge_points":"1200","customer_logo":"https:\/\/monta.com\/app\/uploads\/sites\/23\/2025\/05\/Electron_Charger.png","measurable_result_number":[{"the_number":"$800K","description":" in incentive revenue captured"},{"the_number":"95","description":"installations in four months"},{"the_number":"35%","description":"lower cost per port after switching backends"}],"table":{"table_problem":"Electron's previous backend relied on manual workarounds that would not scale. High per port pricing and heavy admin started eating into margins and made it harder to stay competitive as deployments increased.","table_solution":"Electron migrated to Monta to remove these operational bottlenecks that were slowing growth. By automating revenue workflows and improving visibility into their network, the team freed up time previously spent on manual admin and reactive support. ","table_result":"Electron captured $800K in AES Indiana's first come, first serve utility incentives by moving faster than the competition, made possible by Monta's OpenADR 2.0b certification work, streamlined payouts, diagnostics, and deployment tools that kept the rollout on track."},"key_features_posts":false},"_links":{"self":[{"href":"https:\/\/monta.com\/en-us\/wp-json\/wp\/v2\/case-studies\/5109","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/monta.com\/en-us\/wp-json\/wp\/v2\/case-studies"}],"about":[{"href":"https:\/\/monta.com\/en-us\/wp-json\/wp\/v2\/types\/case-studies"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/monta.com\/en-us\/wp-json\/wp\/v2\/media\/5114"}],"wp:attachment":[{"href":"https:\/\/monta.com\/en-us\/wp-json\/wp\/v2\/media?parent=5109"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/monta.com\/en-us\/wp-json\/wp\/v2\/tags?post=5109"},{"taxonomy":"case_study_country","embeddable":true,"href":"https:\/\/monta.com\/en-us\/wp-json\/wp\/v2\/case_study_country?post=5109"},{"taxonomy":"product","embeddable":true,"href":"https:\/\/monta.com\/en-us\/wp-json\/wp\/v2\/product?post=5109"},{"taxonomy":"key_features","embeddable":true,"href":"https:\/\/monta.com\/en-us\/wp-json\/wp\/v2\/key_features?post=5109"},{"taxonomy":"company_size","embeddable":true,"href":"https:\/\/monta.com\/en-us\/wp-json\/wp\/v2\/company_size?post=5109"},{"taxonomy":"industry","embeddable":true,"href":"https:\/\/monta.com\/en-us\/wp-json\/wp\/v2\/industry?post=5109"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}