How do I use a public installer page?
This guide is for installers who have received a public installer link and need to complete an installation job, including updating charge point details, running remote tests, and marking the job as complete.
The installer page is a public link generated by the operator for a specific installation job. Open it in any browser on a phone, tablet, or desktop. No Monta login is required.
From the installer page you can:
- View job and site details
- Edit charge point serial numbers and connector positions
- Check connection status
- Perform remote test actions
- Add notes for the operator
- Mark the installation job as complete
1. Open the installer job
- Open the public installer link provided by the operator.
- The installer job opens in your browser. No login is required.
- At the top of the page, review:
- Installer job number and status
- Charging site name
- Job description and installation instructions
- Total number of charge points on the site
- How many charge points are currently connected (for example, 8 / 14 connected)
2. Update charge point details
Each charge point is listed in a table with its current configuration and status.
Edit the serial number
- Locate the charge point in the list.
- In the Charge Point Identity field, enter the correct serial number.
Select the connector position
- Locate the charge point in the list.
- In the Connector field, select the correct connector number.
- Verify the selected connector matches the physical installation.
3. Check charge point status
Each charge point shows a Status value indicating its configuration and connection state.
Validation messages indicate configuration issues:
- No serial — no serial number is set for the charge point.
- Serial is in use by: [Team Name] — the serial number is already assigned to a charge point on another team.
If no validation issues exist, the status reflects the charge point's connection state. Possible states include:
- connected
- disconnected
- error
- pending
- Not connected (no integration configured)
- no_integration
When the charge point state differs from the integration state, the status shows both: for example, connected (available) or disconnected (maintenance).
4. Perform remote actions
- Locate the charge point you want to test.
- Select Remote actions.
- Choose from the available actions:
- Start — start a charging session to test the installation
- Stop — stop an active charging session
- Unlock — unlock the connector
- Reboot — restart the charge point
5. Add notes on a charge point
- Locate the charge point in the list.
- Select Notes.
- Enter your message in the Installer note field.
- Select Save.
6. Mark the installation job as complete
- Review all charge points to confirm they are correctly installed and tested.
- Confirm that serial numbers and connector positions are correct.
- Select Mark as complete.
- Review the Activate All Charge Points option in the confirmation dialog:
- By default this option is checked, meaning all inactive charge points will be activated when the job is completed.
- Uncheck this option if you do not want charge points to be activated immediately.
- Confirm completion of the job.
Important: By default, completing the job activates all inactive charge points in the group. Only disable this option if the site should remain inactive after installation.