How do I create a Load Management group?
This article explains how to create and configure a Load Management group (formerly Load Balancing) in Monta Hub and Monta Control, including power distribution, external meters, sub-groups, and scheduled load management.
Load Management (previously known as Load Balancing) distributes available electrical capacity across multiple charge points to prevent overloading. This guide covers how to create and configure a Load Management group in Monta. For a technical deep-dive, download the Load Management technical white-paper.
How do I create a team-level Load Management group?
Use this option if your charge points are all set up within one team.
- Open the Team where your charge points are located.
- Select the Charge Points tab.
- Navigate to Load Management (the page opens in Monta Control).
- Click + Create.
How do I create an operator-wide Load Management group?
Use this option to group charge points across different teams that share the same physical site.
- Open Charging points from the left-side menu.
- Click Load Management.
- Click + Create.
How do I configure available amps and power distribution?
- Navigate to the Configure section.
- Name the Load Management group.
- Fill in Total amps available — the amps available per phase for both charging and the building.
- Select a Power distribution method:
- Equal share — power is distributed equally among all charging cars on the site.
- First come, first served — cars are prioritized by order of starting the charge.
How do I add an external meter for dynamic load management?
Dynamic Load Management requires an external meter connected to Monta. Monta currently supports Perific and ABB ModBus meters.
- Toggle on External Meter and select the meter type.
- Select the placement:
- Including charge points — meter measures building consumption plus charge points.
- Excluding charge points — meter measures only building consumption.
- Enter a Dynamic buffer — a safety buffer to prevent exceeding total capacity when building consumption changes. The recommended value is the highest expected increase in building consumption within one minute.
- Enter a Backup charging limit — the number of amps to use if the meter cannot communicate current consumption to Monta.
- Click Save changes.
How do I create a sub-group?
A sub-group represents a subset of charge points sharing the same available amps on a site. To create a sub-group, click the + button in the Load management sub-groups section. External meters can only be added to the main group, not to sub-groups.
How do I add or remove charge points from a group?
- Open Charging points from the left-side menu.
- Click Load Management.
- Select the Load Management group.
- Scroll down to the Charging Stations section and click the + button.
- Use the search bar to find charge points by address or serial number.
- Select the charge points to add. Note:
- A charge point can belong to only one group at a time.
- Selecting a charge point with more than one connector automatically adds all connectors to the group.
- Check the supported charge points list to confirm your charge points support Load Management.
Advanced charge point settings
Once a charge point is added, you can configure:
- State — view whether the charge point is Available, Busy, or Unavailable.
- Phase order — the order of phases on the charge point. Confirm with the electrician who wired it. Used for phase rotation.
- Max amps — the maximum amps available for the charge point. Enter whole numbers only (for example, 61, not 61.6).
- Prioritize — prioritized charge points receive current first when distributing among active charge points.
- Connector phases — automatically detected, but can be overridden. Options: Auto Detect, Single Phase (AC), Single Phase (AC – Split Phase), Three Phase (AC), DC.
Click the pen icon on a charge point to access these settings. Click Save after making changes.
How do I set up scheduled Load Management?
Scheduled Load Management ensures less power is available during peak hours and shifts energy use to off-peak periods such as overnight.
- Create a Load Management group and add your charge points following the steps above.
- Scroll down on the group page to the Schedule section.
- Toggle on the Schedule option.
- Select the desired days of the week.
- Set the time range by specifying start and end times.
- Enter the amp value for the selected time period.
- Click Submit to save.
Notes:
- Any time not covered by a schedule defaults to the total available amps for the site.
- Enter whole numbers for max amps. Fractional values (for example, 61.6 A) are rounded down to 61 A.
- For very large sites, create a few short overlapping schedules to ramp up available current gradually rather than switching all at once.