Skip to content

ECOFACTOR TOR

The TOR, designed and manufactured by ECOFACTOR, currently ranks on the Monta supported hardware list. The inclusion of GBT, Tesla, CCS1, CCS2, ChaDeMo connector(s), along with a maximum power output of 320 kW and DC charging capabilities, make the TOR worth considering as a viable option to meet your requirements.
DC
Current type
320 kW
Max power
TOR

ECOFACTOR TOR specifications

Hardware specifications
Specifications
Full name ECOFACTOR - TOR
Manufacturer ECOFACTOR
Supported power 60.0 / 40.0 / 80.0 / 120.0 / 160.0 / 240.0 / 320.0 / 20.0 kW
Type DC
Number of connectors 2
Connector type(s) GBT, Tesla, CCS1, CCS2, ChaDeMo

ECOFACTOR TOR datasheet

Monta features with ECOFACTOR TOR features

Get access to unique features when integrating your charger to the Monta platform.

TOR
  • Local Auth List Management
  • Release Detection
  • Lock Cable
  • Load Balancing
  • Native Qr Serial
  • Firmware Management
  • Auto Start
  • Auto Schedules
  • Eichrecht
  • Powerbank
  • Solar Charge
  • Auto Charge
  • Pricing Display
  • Display Qr Code
  • Iso 15118 2 Plug And Charge
  • Iso 15118 20 Plug And Charge
  • Pricing Display Complete

ECOFACTOR TOR performance and user ratings

Monta is committed to complete transparency through real-world charging and usage statistics. We evaluate all charge points in our network on a set of important criteria: charge success, user satisfaction, and uptime. The 30-day rolling averages influence a charge point models overall performance score and ranking on our supported charging stations.

Performance score

A charge point model's performance score is calculated once a day by averaging its uptime, charge success, and user satisfaction rates. The model with the highest 30-day rolling average ranks first on our supported charging stations. The lower the rolling average, the further down the list it ranks

ECOFACTOR TOR performance score is not available.

Charge success rate

Once a driver starts charging their vehicle, we can track the charge success rate. This is the percentage of sessions that result in a successful energy transfer to a vehicle. In other words, it shows how reliable a specific charge point model is, which is critical for drivers, charge point operators, and manufacturers alike.

Learn the differences between a successful charge and failed charge.

ECOFACTOR TOR charge success rate is not available.

Uptime rate

Few things are more important to an EV driver than arriving at a charge point and feeling confident that it will work. And with more regulatory bodies requiring that we report hardware uptime, this is an essential measure.

Uptime rate tells drivers and manufacturers the percentage of time a charge point model is available compared to when it's out of service. When a model is available, this could mean it's reserved for charging, actually charging a vehicle, finishing a charge, or even sitting idle. When a model is unavailable, it might be because it is offline or experienced an error while delivering energy to a vehicle.

To give you the most accurate data, we look at all instances of a charge point model and have defined when we start and stop measuring uptime.

ECOFACTOR TOR uptime rate is not available.

Performance score
N/A
Charge success rate
N/A
Uptime rate
N/A

Ratings for ECOFACTOR TOR based on Monta's usage data

Resources

Need to integrate a ECOFACTOR TOR with Monta?

Want your hardware on this list?

Contact us